Operator's Manual
Setup
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
1
Nopartsrequired
–
Unfoldthehandle.
Dischargechute1
Chutehandle
1
Phillips-headbolt3
Washer3
2
Locknut3
Installthedischargechute.
1
UnfoldingtheHandle
NoPartsRequired
Procedure
1.Loosenthehandleknobs,pullouttheU-shapedhandle
locksuntilyoucanmovethehandlefreely,androtate
thehandletotheoperatingposition(Figure4).
G016242
Figure4
1.U-shapedhandlelock(2)
2.Handleknobs
2.InserttheendoftheU-shapedhandlelockintothe
openholeinthehandleandtightenthehandleknobs
untiltheyaresnug(Figure5).
Figure5
Important:Ensurethatyoudonotpinchorkink
thecontrolcable(Figure6).
Figure6
1.Controlcable
4