Service Manual

G210–2&G210–4FuelLineInstallation(continued)
g323701
Figure97
1.Clamp
2.PrimerHose
6.Connectthe2wirestothekeyswitchterminals.
Note:Verifythewiresarenotcrossed.
g323698
Figure98
7.Fullyslidetheheaterboxontotheintakestuds.Installthe2(M6)ange
nutssecuringtheheaterboxtotheintakestuds.Torquethenutsto10N
m(89in-lb).
FuelSystem:ServiceandRepairs
Page5–46
G210EngineServiceManual
3439-732RevA