Service Manual
Table Of Contents
- Revision History
- Preface
- Chapter 1 : Safety
- Chapter 2 : Specifications and Maintenance
- Chapter 3 : Troubleshooting
- Chapter 4 : Engine
- Chapter 5 : Controls
- Chapter 6 : Belts
- Chapter 7 : Auger Housing
- Chapter 8 : Auger Gearbox
- Chapter 9 : Wheel Clutch Traction Drive System
- Chapter 10 : Discharge Chute
- Appendix A: Foldout Drawings
- Electrical Schematic with Hand Warmers
- Electrical Schematic
ControlInterlockInstallation(continued)
2.Installthelockoutlinkontothelockoutrod.
3.Installthelockoutcamandaugerlever.
4.Installthe2rollpinsontheLHsideandthepininthelockoutcamonthe
RHside.
5.Installthelockoutlatch,extensionspring,atwasher,andlocknut.Installthe
shoulderscrewundertheRHhandgrip
6.Ifthisisawheelclutchmodel,connectthewheelclutchcables.Connectthe
augerandtractioncablestothelevers.
ControlReplacementandAdjustment
DeectorCableRemoval
1.Parkthemachineonalevelsurface.Stoptheengine,waitforallmoving
partstostopandremovethekey.
2.Depressthetabsthatretainthecableinthebracketunderthecontrolpanel.
DisconnecttheZ-bendontheend.
Figure25
3.Removethecableclampanddisconnectthecableendfromthedeector.
POWERMAX®HDServiceManual
Page5–13
Controls:ServiceandRepairs
3424-820RevA