Service Manual
Table Of Contents
- Revision History
- Preface
- Chapter 1 : Safety
- Chapter 2 : Specifications and Maintenance
- Chapter 3 : Troubleshooting
- Chapter 4 : Engine
- Chapter 5 : Track Drive System
- Chapter 6 : Controls
- Chapter 7 : Belts
- Chapter 8 : Auger Housing
- Chapter 9 : Auger Gearbox
- Chapter 10 : Discharge Chute
- Appendix A: Foldout Drawings
- Electrical Schematic with Hand Warmers
- Electrical Schematic
TrackInstallation(continued)
RHsideofthemachine.Ifadeectionof9.5mm(3/8inch)isnotachieved,
seetheOperator’sManualforthedeectionsettingprocedure.
g332810
Figure10
3.Torquethe2(9/16inch)nutsontheLHbogeyyolkto47.5N•m(35ft-lb).
RepeatontheRHsideofthemachine.
g332809
Figure11
HydroReplacement
HydroRemoval
1.Parkthemachineonalevelsurface.Stoptheengine,waitforallmoving
partstostopandremovethekey.
CAUTION
Donotipthesnowthrowerontheaugerhousing.Damagetothe
hydrostatmayoccur.
2.Usingaoverheadliftingdevice,raisetheunitofftheoor.
TrackDriveSystem:ServiceandRepairs
Page5–6
POWERTRX™HDServiceManual
3440-740RevA