Installation Instructions

1.Routethebranchofthesonicboomwireharness
withthethreelargeconnectorsintothecontrol
panelarea.
2.Ifboomliftswitchesareinstalledremoveany
existingconnectorspluggedintotheliftswitches.
3.Connecttheconnectorwithgreenandwhite,green
andblack,andblackwirestothebottomoftheright
boomliftswitch.
4.Connecttheconnectorwithblueandwhite,blue
andblack,andblackwirestothebottomoftheleft
boomliftswitch.
5.Connecttheconnectorwithpurple,yellow ,andblack
wirestothebottomofthesonicboomswitch.
6.Routethefreeendofthewiringharnessdown
throughtheoorandrearward,throughthewire
loopstothecenterboomassemblyatthebackofthe
vehicle.Usecabletiestosecurethewiringharness
totheotherwiringharnessesawayfromtheengine
andmovingparts.
7.Installthespraycontrolpanelandsecureitwiththe
fastenersremovedpreviously.
ConnectingtheWiringtotheFuseBlock
1.Routethebranchofthesonicboomwiringharness
withthethreeringterminalsintotheseatboxand
tothefusearea.
2.Lifttheseattoaccessthefusearea.Locatethe
auxiliarysolenoidandgroundterminalblock.
3.Connecttheringlabeledgroundontheblackwireto
thegroundterminalblock(Figure18).
Figure18
1.Blackwire3.Redwire
2.Groundterminalblock
4.Auxiliarysolenoid
4.Connecttheredwirewithringconnectortotheload
sideoftheauxiliarysolenoid.
Note:Theloadsidecanbedeterminedbytesting
bothsolenoidpostswhentheignitionisturnedoff.
Thehotsidewillreadapproximately12V,while
theloadsidehasnovoltage.Theloadsidecanbe
conrmedbyturningtheignitiontotherunorOn
positionandtestingtheloadsideagain.Theload
sidewillreadapproximately12Vwiththeignition
on.TurntheignitiontoOffandremovethekey
beforecontinuingwithanyoftheinstallationor
maintenance.
5.Lowertheseat.
InstallingtheControlsonaWorkman
SpraySystem
InstalltheSwitches
1.Removethefourscrewsinthefrontofthecontrol
panelcovertoaccesstheinternalcomponents.
Retainallfasteners.
2.Intheareajustabovethesonicboomswitchplug,
drilla0.375inchdiameterholetoaccommodatethe
indicatorlight(Figure19).
11