Installation Instructions

Note:Theloadsidecanbedeterminedbytesting
bothsolenoidpostswhentheignitionisturnedoff.
Thehotsidewillreadapproximately12V ,whilethe
loadsidewillhavenovoltage.Theloadsidecanbe
conrmedbyturningtheignitiontotheRunorOn
positionandtestingtheloadsideagain.Theload
sidewillreadapproximately12Vwiththeignition
on.TurntheignitiontoOffandremovethekey
beforecontinuingwithanyoftheinstallationor
maintenance.
5.Lowertheseat.
InstallingtheControlsonaWorkman
SpraySystem
InstalltheSwitches
1.Removethefastenersthatsecurethefrontcover
tothecontrolpanelhousingtoaccesstheinternal
components.
Note:Retainallfasteners.
2.Drilla0.50-inchdiameterholetoaccommodatethe
indicatorlightincontrolpanelcover(
Figure20).
G016286
1
1
2
3
Figure20
1.Screw3.Drilledhole(0.50inch
diameter)
2.Latches
3.Installtheindicatorlightthroughthebackofthe
hole,andsecureittothefrontpanelwiththe
fastenersthatareincluded(Figure21).
4.Removethesonicboomswitchplugfromthefront
panel,andinstallthesonicboomrockerswitch
(Figure21).
Figure21
1.Spraycontrolpanel
5.Indicatorlight,install
2.Sonicboomplug6.Sonicboomswitch
3.Existingboomliftswitches7.Sonicboomconnector,
fromsonicboomwire
harness
4.Existingboomlift
connectors
8.Boomliftconnectors,from
sonicboomwireharness
5.Locateanddisconnecttheplugsfortheboomlift
switches(Figure21).
Important:Donotcutorremoveanyunused
connectors.Storetheunusedconnectorsinthe
controlboxforfutureuseintheeventthatthe
sonicboomkitisremoved.
6.Changetheorientationoftheboomliftswitches:
A.Locatetheboomliftswitchesinthecontrol
panel,andremovebothswitchesfromthepanel.
B.Usingaatheadscrewdriverorsimilartool,
gentlyprytherockerswitchcoversfromthe
switchbodies(
Figure22).
11