Operator's Manual

2.Installthecontrolbox,withthecontrolsfacingthe
driver,tothecontrolmountusingtheclevispinand
hairpinremovedpreviously.
3.Installthehandknobtostabilizethecontrolbox.
Tightenbyhand.
4.InstalltheSprayProDecaltothemonitor
(Figure25).
Figure25
1.Spraypromonitor3.Decal,Lowerhalf
2.Decal,Upperhalf
Note:Besuretoorientthedecalasshownin
Figure38.
5.Connectthetankskidwiringharnesstothespray
systempowerconnector.
6.InstalltwoJ-clipsinthecenterconsoleatthepoints
locatedinFigure26usingtheexistingscrews.
Figure26
1.J-clip
3.Controlboxharness
2.Existingscrews
4.Centerconsole
7.InstallaJ-clipintheROPScoverbehindtheoperator
usingabolt(1/4x1inch)andanut(1/4inch).The
holeisonthecenterline,approximately20inchesin
fromtheoperator’ssideedgeoftheROPScover.
Note:Ifaholeisnotpresent,onemustbedrilled.
Drilla1/4inchholeinthetopsurfaceofthecover
onthecenterlineapproximately20inchesfromthe
edgeontheoperator’sside(Figure27).
G01 1762
1
2
Figure27
1.Drillhole(1/4inch)
2.20inches
8.Securethecontrolboxharnesstotheconsoleand
ROPScoverusingtheJ-clips.
11
InstallingtheBoomAssembly
Partsneededforthisprocedure:
1
Centerboomassembly
10
Bolt(3/8x1-1/4inches)
10
Locknut(3/8inch)
2Boomtransportcradle
4
Bolt(1/2x1-1/4inches)
4
Flangenut(1/2inch)
1
Leftboomextension
1Rightboomextension
Procedure
1.Locateandremovethecenterboomassemblyfrom
packaging.
2.Installtheboomtransportcradlestothecenter
boomusing6bolts(3/8x1-1/4inches)and6lock
nuts(3/8inch).OrientthemasshowninFigure28.
22