Operator's Manual

Step
Description
Qty.
Use
Knob
1
J-clips
3
Bolt (1/4 x 3/4 inch)
1
Flange nut (1/4 inch)
1
Spray Pro decal, US
1
10
Spray Pro decal, CE
1
Install the control box.
Center boom assembly
1
Bolt (3/8 x 1-1/4 inches)
10
Lock nut (3/8 inch)
10
Boom transport cradle
2
Bolt (1/2 x 1-1/4 inches)
4
Flange nut (1/2 inch)
4
Left boom extension
1
11
Right boom extension
1
Install the boom assembly.
Hose clamps
3
R-clamp
2
Shoulder bolt
2
Washer
2
12
Nut
2
Install Boom Hoses
Operator’s Manual
1
Operator Training Material
1
Parts Catalog
1
Registration Card
1
Selection guide
1
14
Pre-delivery Inspection Sheet
1
Read the manuals and view the
training material before operating
the machine.
Note: Deter mine the left and right sides of the
mac hine from the nor mal operating position.
Step
1
Removing Existing Bed
No Parts Required
Procedure
1. Star t the engine . Eng ag e the h y draulic lift lev er
and lo w er the bed until cylinders are loose in
slots . R elease the lift lev er and the tur n off
engine .
2. R emo v e the lync h pins from the outer ends of
the cylinder rod clevis pins ( Figure 3 ).
Figure 3
1. Bed mounting plate 4. Lynch pin
2. Cylinder rod end
5. Rear slots (Full bed)
3. Clevis pin
6. Front slots (2/3 bed)
3. R emo v e the clevis pins securing the cylinder
rod ends to the bed mounting plates b y
pushing the pins to w ard the inside ( Figure 3 ).
13