Operator's Manual

Figure 15
Left hand side shown
1. Lift cylinder bracket 3. Bolts
2. Hold-down bracket 4. Lift cylinder
3. R e peat ste ps to install the hold-do wn brac k et
on the opposite side .
Step
8
Installing the Radiator
Cover
Parts needed for this step:
1
Radiator cover assembly
4
Bolt (1/4 x 3/4 inch)
Procedure
T he radiator co v er is shipped with an additional
panel installed for air cooled v ehicles . If y ou are
installing the co v er onto a liquid cooled v ehicle ,
remo v e the extra co v er .
1. Locate the spra y system po w er connector on
the wiring har ness installed previously .
2. Install the radiator co v er assembly o v er the
v ehicle’ s radiator ( Figure 16 ).
Important: Mak e sur e the spray system
po w er connecter is r outed to w ard the fr ont
of the v ehicle and not trapped under the
radiator co v er assembl y .
Figure 16
Left hand side shown
1. Radiator cover assembly
3. Spray system power
connector
2. Bolt (3/8 x 1 inch)
3. Secure the co v er to the frame using four bolts
(3/8 x 1 inc h).
Step
9
Installing the Tank Skid
Parts needed for this step:
1
Tank and skid assembly
2
Clevis pins
4
Lynch pins
2
Bolt (1/2 x 1-1/2 inches)
4
Washers (1/2 inch)
2
Nuts (1/2 inch)
Procedure
T he spray er tank assembl y r epr esents
a stor ed energ y hazard. If not pr oper l y
r etained when installing or r emo ving the
assembl y it can mo v e or f all and injur e y ou
or other bystander s.
Use straps and an o v erhead lift to suppor t the
spray er tank assembl y during installation,
r emo v al or an y maintenance when the
r etaining f astener s ar e being r emo v ed.
19