Operator's Manual

Important: V erify the PT O shaft is
secur ed by making sur e the locking balls
ar e seated in the g r oo v e of the output shaft.
9. Line up the front mounting brac k ets with the
hold do wn brac k ets installed previously .
10. Secure the tank skid assembly to the frame
with a bolt (1/2 x 1-1/2 inc hes), tw o w ashers
(1/2 inc h), and a loc kn ut (1/2 inc h) as sho wn
in Figure 21 .
Figure 21
Left side shown
1. Front mounting bracket
4. Washer (1/2 inch)
2. Hold-down bracket
5. Locknut (1/2 inch)
3. Bolt (1/2 x 1-1/2 inches)
11. R e peat these ste ps for the front mounting
brac k et and hold-do wn brac k et on the opposite
side .
Step
10
Installing the Control Box
Parts needed for this step:
1
Knob
3
J-clips
1
Bolt (1/4 x 3/4 inch)
1
Flange nut (1/4 inch)
1
Spray Pro decal, US
1
Spray Pro decal, CE
Procedure
T he control bo x is mounted on the tank skid b y
a clevis pin, and hair pin. It is located on the left
side to w ard the bac k.
1. R emo v e the clevis pin, and hair pin securing
the control bo x to the tank skid.
2. Install the control bo x, with the controls facing
the dri v er , to the control mount using the
clevis pin and hair pin remo v ed previously .
3. Install the hand knob to stabilize the control
bo x. Tighten b y hand.
4. Install the Spra y Pro Decal to the monitor
( Figure 22 ).
Figure 22
1. Spray pro monitor
3. Decal, Lower half
2. Decal, Upper half
Note: Be sure to orient the decal as sho wn
in Figure 35 .
5. Connect the tank skid wiring har ness to the
spra y system po w er connector .
6. Install tw o J-clips in the center console at the
points located in Figure 23 using the existing
screws .
21