Operator's Manual

Figure 23
1. J-clip 3. Control box harness
2. Existing screws
4. Center console
7. Install a J-clip in the R OPS co v er behind the
operator using a bolt (1/4 x 1 inc h) and a
n ut (1/4 inc h). T he hole is on the centerline ,
appro ximately 20 inc hes in from the operator’ s
side edg e of the R OPS co v er .
Note: If a hole is not present, one m ust be
drilled. Drill a 1/4 inc h hole in the top surface
of the co v er on the centerline appro ximately
20 inc hes from the edg e on the operator’ s side
( Figure 24 ).
Figure 24
1. Drill hole (1/4 inch)
8. Secure the control bo x har ness to the console
and R OPS co v er using the J-clips .
Step
11
Installing the Boom
Assembly
Parts needed for this step:
1
Center boom assembly
10
Bolt (3/8 x 1-1/4 inches)
10
Lock nut (3/8 inch)
2
Boom transport cradle
4
Bolt (1/2 x 1-1/4 inches)
4
Flange nut (1/2 inch)
1
Left boom extension
1
Right boom extension
Procedure
1. Locate and remo v e the center boom assembly
from pac kaging .
2. Install the boom transpor t cradles to the center
boom using 6 bolts (3/8 x 1-1/4 inc hes) and 6
loc k n uts (3/8 inc h). Orientate them as sho wn
in Figure 25
Figure 25
3. Mount the center boom assembly to the spra y
system assembly at the boom frame mounts as
22