Operator's Manual

2. R emo v e the cotter pin from the pi v ot pin
( Figure 44 ).
Figure 44
1. Actuator
4. Cotter
2. Actuator rod
5. Pin
3. Boom pivot pin housing
3. Lift up on the boom and remo v e the pin
( Figure 44 ). Slo wly lo w er the boom to the
g round.
4. Inspect the pin for any damag e , re place if
necessar y .
5. Manipulate the actuator rod bearing end and
apply g rease into the bearing ( Figure 45 ). Wipe
off ex cess g rease .
Figure 45
Right boom
1. Grease bearing
6. Raise the boom to align the pi v ot with the
actuator rod. W hile holding the boom, inser t
the pin through both boom pi v ot and actuator
rod ( Figure 44 ).
7. With the pin in place , release the boom
and secure the pin with the cotter remo v ed
previously .
8. R e peat the procedure for eac h actuator rod
bearing .
Spray System
Maintenance
Inspecting the Hoses
Ev er y 200 hours , examine eac h hose in the spra y
system for crac ks , leaks or other damag e . At the
same time , inspect the connections and fittings for
similar damag e . R e place any hoses and fittings if
damag ed.
Pump Maintenance
Inspecting the Pump
Ev er y 400 hours and/or yearly , ha v e an A uthorized
T oro Ser vice Distributor c hec k follo wing inter nal
pump components for damag e:
Pump diaphragm
44