Operator's Manual

11.Locateasuitablelocationnearthefuseboxtoinstall
thefusedecal.Makesurethesurfaceiscleananddry,
thenplacethedecal
12.Installthefusesandthermalbreakers:
A.Installthetwo30ampthermalbreakerstotheleft
andrightboomliftfuseslots(Figure12).
B.Installthe10ampfusetothespraysystempower
fuseslot(
Figure12).
13.Routethewiringharnessthroughtheopeninginthe
oor,undertheseatbase,andrearwardalongwiththe
existingwiring.
14.AttheROPScover,rearoftheseatassembly,routethe
wiringharnessupfromundertheseatandabovethe
frame.Makesurethespraysystempowerconnectoris
outfromunderneaththevehicle(Figure13).
G01 1758
1
2
3
4
5
Figure13
1.ROPScover4.Spraysystempower
connector
2.Wiringharness5.Wireharnessroutedback
tospeedsensor
3.Leftframe
15.Routetheharnessalongtheframeandbacktowhere
thespeedsensorisconnectedtotheexistingwiring
(Figure9).
16.Disconnectthespeedsensorfromtheexitingwiring
harnessandconnectittotheelectricalconnectoron
thespraysystemwiringharness.
17.InstalltheY-shapedjumperharnessbetweenthespeed
sensorandtheexistingandspraywiringharnesses.
Connectthespeedsensortoboththeexistingwire
harnessandthespraysystemwireharness(Figure14).
G012932
1
2
3
Figure14
1.Connecttospeedsensor3.Connecttospraysystem
wiringharness
2.Connecttoexistingwiring
harness
18.Usewiretiestosecuretheharnesstotheexisting
wiringandpositionitawayfromanymovingpartsand
heatsources.
19.Toinstallthehood,completethefollowing:
A.Connectthelights.
B.Insertthetopmountingtabsintotheframeslots.
C.Insertthelowermountingtabsintotheframe
slots.
D.Ensurethatthehoodisfullyengagedinthetop,
sidesandbottomgrooves.
6
InstallingtheControlBox
Mount
Partsneededforthisprocedure:
4
Bolt(1/4x3/4inch)
4
Flangenut(1/4inch)
1
Controlboxmount
4
Bolt(5/16x1inch)
4
Locknut(5/16inch)
1Adapterplate
Forvehicleswithaserialnumberof
240000001orhigher
Onsomevehiclesthecontrolmountplateisattachedto
thedashboardatthesamepointthehandthrottleassembly
16