Operator's Manual

G015845
1
2
1 5
3
4
Figure29
1.Mountingbolts4.Torquewrenchinpulley
mountingbracket[200
to230in-lb(22.6to26.0
N-m)]
2.Pulley5.Belt
3.Holefortorquewrench
2.Positionatorquewrenchintothepulleymounting
bracket(Figure29).
3.Pivotthepulleymountingbracketawayfromthe
nozzleuntilthetorquewrenchreads200to230in-lb
(22.6to26.0N-m)(Figure29).
4.Tightenthemountingbolts.
ElectricalMaintenance
Important:Beforeweldingonthemachine,
disconnectthecontrollerandthenegativecable
fromthebatterytopreventdamagetotheelectrical
system.
ChargingtheBattery
DANGER
Batteryelectrolytecontainssulfuricacidwhichisa
deadlypoisonandcausessevereburns.
Donotdrinkelectrolyteandavoidcontactwith
skin,eyesorclothing.Wearsafetyglassesto
shieldyoureyesandrubberglovestoprotect
yourhands.
Fillthebatterywherecleanwaterisalways
availableforushingtheskin.
WARNING
CALIFORNIA
Proposition65Warning
Batteryposts,terminals,andrelated
accessoriescontainleadandleadcompounds,
chemicalsknowntotheStateofCalifornia
tocausecancerandreproductiveharm.
Washhandsafterhandling.
1.Removetheclipssecuringthebatterycovertothe
batteryboxandremovethecoverfromthebox
(Figure30).
G02071 1
1
2
3
Figure30
1.Batterybox3.Batteryclips
2.Batterycover
25