Setup Instructions

Page 22
How to Install the ProPass
Conveyor and Swivel Kit
Before installing the Cross Conveyor to the ProPass, the
Side Rail Doublers must be installed on the ProPass.
Using the bolts currently installed in the ProPass Scraper
(arrows), install the left and right side Doublers (see
Figure 64). Ensure the scraper remains in contact with
the belt.
Figure 64: Install doublers onto ProPass
1. If there will be a twin spinner used on the same
ProPass, remove the top 3/8” (9.5mm) UHMW
spacer as shown in Figure 65 , as well as the ¼”
(6.35mm) metal spacer and replace them with the ¼”
(6.35mm) UHMW and 5/16” (9.5mm) spacer
provided. This will allow the previously installed
side rail doublers to remain in place whether a twin
spinner or conveyor and swivel kit are installed.
Figure 65: Twin Spinner UHMW Replacement
2. Remove the Swivel and Conveyor from the crate.
3. Leaving the Conveyor attached to the Swivel and
with the aid of an assistant, lift the Swivel into
position and align the plastic bearing locations with
the mounting brackets (see Figure 66 arrows).
Figure 66: Lift the swivel into position on ProPass
4. Clamp the Swivel to the ProPass using the Quick
Attach Latches. If the Latches are not snug when
clamping, loosen the two ¼” (6.35mm) bolts on the
Latches and adjust them until the Latches clamp tight
enough to keep the Swivel snug on the ProPass (see
Figure 67).