Service Manual

Chassis Page 5 - 16 GreensPro 1200
Installation
(Figures 26 through 36.)
Figure 26
1. Install lower flange (5) and bearing (1) onto steering
pivot assembly (2), to achieve an approximate distance
of 3.13 in. (7.95 mm) (6) from bottom of steering pivot
assembly (2).
2. Install upper flange (3) onto steering pivot assembly
(2), and tighten two socket-head set screws (4).
Figure 27
3. Install steering pivot assembly (2), two cap screws
(7), four flat washers (8), and two lock nuts (9) to
chassis (10). Make sure that beveled corners of pivot
assembly are oriented toward front of machine.
Figure 28
4. Attach steering pivot rod (11) to steering pivot
assembly (2) with cap screw (12), plated washer (13),
flat washer (14), and lock nut (15).
Figure 29
5. Install Woodruff key (16) into slot on steering pivot
assembly (2).
Figure 30
6. Install universal joint (17) on steering pivot assembly
(2), and tighten cap screw (18).
1
4
2
3
5
6
10
2
7 8 9
2
12 13 14
11
15
16
2
17
18
2