Service Manual

Chassis Page 5 - 40 GreensPro 1200
7. Remove eight nuts (24), eight tow bar clamp screws
(15), and 16 heavy flat washers (14), and remove four
pairs of axle clamps (9) and eight axle clamp plates
(13).
8. Remove tow bar (12).
Installation
(Refer to Figure 76.)
1. Install the tow bar (12) using four pairs of axle
clamps (9) and eight axle clamp plates (13), eight nuts
(24), eight tow bar clamp screws (15), and 16 heavy flat
washers (14). The fasteners for the tow bar should be
tightened to 35 ft-lb (47.5 N-m).
2. Before securing lifting bars to tow bar, check that the
length of the lifting bars is 26.77 in. (680 mm) between
centers of ball joints. Adjust lifting bar if necessary (see
Lifting Bar Adjustment in the Adjustments section of
this chapter).
3. Connect lifting bar (21) to tow bar (12) using
bushing (16), cap screw (19), flat washer (18), nut (11),
and flat washer (10).
4. Connect lifting bar (3) to tow bar (12) using bushing
(8), cap screw (5), flat washer (6), flat washer (10), and
nut (11).