Setup Instructions

Setup Instructions Page 9
How to Set Up the MH Processor
1. Remove all wooden shipping blocks and banding
before proceeding with set up. Also remove the loose
stand components and set them aside.
2. The hopper is shipped inverted on the conveyor.
Install the hopper onto the conveyor so that the
opening of the hopper is facing upwards and is at a
45 degree angle. Using six 3/8” x 1” (9.5 x 25 mm)
bolts, six nylon locking nuts and twelve washers,
fasten the base of the hopper to the conveyor.
Figure 23: MH Processor in shipping crate
3. Install the conveyor gate handle to the hopper using
the 3/8” x 1-1/2” (9.5 x 38 mm) bolt, nylon locking
nut and 3 washers, locating one washer on either side
and one between the handle and hopper.
4. Refer to steps 2 to 5 of “How to set up the Cross
Conveyor” to assemble the motor and motor guard.
5. Assemble the processor stand.
Figure 24: Processor stand
a. Install the bottom tubes to the tabs of
the footer using four 3/8” x 2” (9.5 x
51mm) bolts and nylon locking with
and washers.
b. Install the lower support using two 3/8”
x 2-3/4” (9.5 x 70 mm) bolts and nylon
locking with and washers.
c. Install the upright brace to the left and
right uprights using four 3/8” x 2” (9.5
x 51mm) bolts and nylon locking with
and washers.
d. Install the bottom of the uprights to the
bottom tubes using two 3/8” x 2-3/4”
(9.5 x 70 mm) bolts and nylon locking
with and washers.
e. Finally, install the flat bar braces
between the uprights and bottom tubes
using a total of four 3/8” x 2” (9.5 x
51mm) bolts and nylon locking with
and washers.