Setup Instructions

Page 14 Setup Instructions
18. Attach the opposite end to the valve solenoid port #1
(Figure 36, left arrow, and Figure 44).
Figure 36: Install Item 6 hose and fitting end
to point B
19. Install the Item 7 hose and 90-degree fitting end to
point A of the hydraulic control valve (Figure 37, top
arrow, and Figure 44).
20. Attach the opposite end to the valve solenoid port #2
(Figure 37, bottom arrow, and Figure 44).
Figure 37: Install Item 7 hose and fitting ends to point
A and B
21. Tighten the hoses so they will not come in contact
with the other hoses.
22. Re-install the hydraulic valve cover to the fender and
the fender guard.
23. Remove the hydraulic hose clamp at the front left
corner of the MH-400. Discard the 6.25 cm (2½ in)
bolt only (Figure 38).
Figure 38: Remove hydraulic hose clamp
24. Route the grey wiring from the hydraulic valve
solenoid along the return hose (the one with the one-
way check valve).
25. Using cable ties, evenly space and attach the wiring
harness from the hydraulic valve solenoid up to the
first wiring harness juncture (Figure 39).
Figure 39: Space and attach grey wiring harness
26. Lay the hose sheath out on the bench. Fold both ends
by 5 cm (2 in). (Folding both ends of the hose sheath
will prevent it from fraying.)