Operator's Manual
PerSecond—informationonlinetwo.Thesubsequentcycle
displaystheOperatingFrequency(Channel)onwhichthe
unitscommunicate,thentheHandheldRemoteIDnumber,
followedbytheassociatedBaseUnitID.Bothhandheldand
baseIDsareshownashexadecimalvalues.
LoadingMaterial
Loadthemachinefromthetoporfromtherear.
Formostmaterials,suchassandorgravel,youcanuseafront
endbucketloader.Formaterialssuchaslandscapingties
orfertilizerbags,loadfromtherearbyplacingthematerial
ontheconveyorbeltandsettingthehydraulicsintheload
position.
Youmayneedtoremovethereargateforeasieraccess.
Ifsacksofmaterialarebeingused,emptythesacksintothe
loader’sbucketbeforeloadingthematerialintothehopper.
Toensurestability,distributetheloadevenly,fronttoback
andsidetoside.
UnloadingMaterial
WARNING
Donotstandbehindthemachinewhileunloading
BulkUnloading
1.Backthemachineintothelocationwhereyouwantthe
materialdeposited.
2.Releasethereargatelatchesandturnontheconveyor
belt.
3.Ifdesired,raisetherearofthemachine.Thisunloads
materialatadifferentangle,andallowsquickunloading
oftheentireload.
ControlledUnloading
1.Closethereargatelatches.
2.Usethejackhandletoopenorclosetheadjustable
sectionofthereargate(Figure27andFigure28).This
restrictstheowofmaterialswhenusinganoption.
CAUTION
Usetheadjustablesectionofthereargateonly
whenunloadingmaterialsmallerthan1inch
(25mm)indiameter,suchassandorgravel.
CAUTION
Openthereargatecompletelyifmaterialwill
notowthroughtheadjustablesection.Test
eachnewmaterialrst.
Figure27
1.Reargate2.Feedgatejack
Figure28
1.5inch(12.5cm)maximum
opening
2.Feedgate
TwinSpinnerOperation
InstallingtheTwinSpinner
TheMH-400comesequippedwithapairofquickattach
mountingclamps.Usetheseclampstomountthetwin
spinnertotheMH-400.
1.Removethesafetylatchclipsfromtheclamphandles
(
Figure29).
29