Operator's Manual

SupportingtheFrontofthe
MachinewiththeJack
1.Unloadallmaterialfromthehopper.
2.Parkthemachineonalevelsurface,engagethe
parkingbrake,shutoftheengine,removethe
key,andwaitforallmovingpartstostopbefore
leavingtheoperator’sseat.
3.Chockthetires.
4.Removethepinthatsecurethejacktothehitch
tube(Figure27).
g272502
Figure27
1.Hitchtube3.Jack
2.Pin
5.Rotatethejackvertical(Figure27).
6.Insertthepinthroughthehorizontalholesonthe
jackandhitchtube(Figure27).
7.Lowerthejacktosupportthemachine.
StowingtheJack
1.Alignthedrawbarofthetractionunitwiththe
hitchtubeofthemachine,engagetheparking
brake,shutoftheengine,removethekey,and
waitforallmovingpartstostopbeforeleaving
theoperator’sseat.
2.Securethehitchtubetothedrawbarwiththe
hitchpin.
3.Raisethejack.
4.Removethepin(Figure28).
g272501
Figure28
1.Hitchtube3.Jack
2.Pin
5.Rotatethejackhorizontal(Figure28).
6.Insertthepinthroughthehorizontalholesonthe
jackandhitchtube(Figure28).
27