Operator's Manual

6
1. Install the light bulb (Fig. 8).
2. Firmly center the cable straight over the
piercing points (Fig. 9).
3. Attach the stake to the fixture (Fig. 10).
Slide the closed stake onto the fixture base,
locking the cable against the contacts (follow the
arrow direction on the fixture).
4. Run the cable through the stake (Fig. 11).
Open the stake by pinching together the locking
tabs near the base of the stake.
Fold the cable into each side of the stake. Align
the cable with the notches at the bottom of the
stake and snap the stake closed.
5. Put the stake into the ground (Fig. 12).
Pathway Lights
Fig. 8 Fig. 9 Fig. 10 Fig. 11 Fig. 12
1. Install the light bulb (Fig. 13).
2. Firmly center the cable straight over the
piercing points (Fig. 14).
3. Attach the stake to the fixture (Fig. 15).
Slide the closed stake onto the fixture base,
locking the cable against the contacts (follow the
arrow direction on the fixture).
Premium Traditional Pathway Lights
4. Run the cable through the stake (Fig. 16).
Open the stake by pinching together the locking
tabs near the base of the stake.
Fold the cable into each side of the stake. Align
the cable with the notches at the bottom of the
stake and snap the stake closed.
5. Optional: Removing Traditional Pathway
Light middle tier (Fig. 17 & 18).
Fig. 13 Fig. 14 Fig. 15 Fig. 16 Fig. 17 Fig. 18