Operator's Manual

g021091
Figure5
1.Supportpoints
3.Removethe2nutsandboltsthatsecurethe
frontstabilizerlegtotheframe(Figure6)and
removethefrontstabilizerleg.
g021092
Figure6
1.Frontstabilizerleg
4.Installthetongueintotheopeningatthefront
ofthemachineandsecureitwith6nutsand
shortboltstorquedto102N∙m(75ft-lb);refer
toFigure7.
g021093
Figure7
1.Clevispin
4.Nut
2.Longbolt5.Tongue
3.Shortbolt
6.Frontstabilizerleg
5.Alignthetoprearholeinthefrontstabilizerleg
totheholepastthehandleinthefrontofthe
tongue(Figure7).
6.Installthelongboltthroughtheholesandsecure
itwithanuttorquedto102N∙m(75ft-lb);refer
toFigure7.
Note:Thestabilizerlegpivotsrearwardonthe
bolt.Ifyouinstalltheboltintothewronghole,
thestabilizerlegwillnotworkproperly.
7.Inserttheclevispintolockthefrontstabilizerleg
inposition(Figure7).
3
InstallingtheSafetyChain
Partsneededforthisprocedure:
1
Safetychain
2
Connectinglink
Procedure
Formahookontheendofabendablepieceofrodor
stiffwire(notincluded)andinstallthesafetychainand
connectinglinksasshowninFigure8orFigure9.
g035100
Figure8
Side-DumpModels
11