Operator's Manual

3
InstallingtheSafetyChain
Partsneededforthisprocedure:
1
Safetychain
2
Connectinglink
InstallingtheSafetyChaintothe
Machine
1.Formahookontheendofabendablepieceofrodor
stiffwire,(notincluded),andinsertitthroughboth
keyholesinthefrontpostofthemachine(Figure8and
Figure9).
A
B
C
D
g019883
2
3
4
3
1
Figure8
Models68004C,68006C,and68009C(Side-dump)
1.Keyhole
3.Safetychain
2.Rodorwire(notincluded)4.Connectinglink
A
C
G019919
2
3
4
3
1
Figure9
Models68007Cand68008C(End-dump)
1.Keyhole
3.Safetychain
2.Rodorwire(notincluded)4.Connectinglink
2.Attachthesafetychaintothelengthofrodorwire
(Figure8andFigure9).
3.Pulltherod,orwire,andthesafetychainthroughboth
keyholes(Figure8andFigure9).
Note:Ensurethatapproximatelyequallengthsof
safetychainextendfromeithersideofthefrontpost.
InstallingtheConnectingLinks
1.Aligntheconnectinglinktothelastlinkinendofthe
safetychain(Figure8andFigure9).
2.Inserttheconnectinglinkthroughthechainlinkuntil
theconnectinglinksnapsclosed(
Figure8andFigure
9
).
3.Repeatsteps1and2toinstalltheotherconnectinglink
intheotherendofthesafetychain.
11