Operator's Manual

ScreedingaConcreteSurface
LevelingtheConcreteSurface
Thisprocedurelevelsafreshlypouredconcreteprojectto
theformheight.
Note:Theforwardscreedboardislocatedadjacenttothe
eccentricguard.
1.Liftandalignthescreedontotheendoftheconcrete
formswiththeforwardscreedboardatthefrontof
thescreedpass.
G020895
1
2
3
4
5
Figure19
1.Forwardscreedboard
4.Liftbracket
2.Handlebar5.Rearscreedboard
3.Eccentricguard
2.Starttheengine;refertoStartingtheEngine(page13).
3.MovethethrottlelevertotheFastposition;referto
ThrottleLever(page9).
4.Pullthescreedinslow,steadymotionalongthe
concreteforms(Figure20).
Note:Ensurethatanadequateamountofconcreteis
loadedaheadoftheforwardscreedboardfortheentire
screedingpass.
G020886
Figure20
Note:Useadditionalpeopletomovethescreedby
havingthempullthescreedwiththetowgripsand
ropesthatareattachedtothespreaders(Figure20).
5.Attheendofthescreedpass,movetheenginethrottle
totheidlepositionandallowtheenginetoidlefor1
minute.
6.Stoptheengineandmovethescreedofftheforms;
refertoStoppingtheEngine(page13).
7.Cleanthescreedofcement,sand,andaggregateafter
eachpasswithwaterandasoft-bristlebrush.
15