Operator's Manual

5.Pulltherecoil-starthandlelightlyuntilyoufeel
resistance,thenpullthehandlebriskly(Figure20).
Note:Returntherecoil-starthandlegently.
g021475
Figure20
6.IfthechokeleverissettotheClosedpositionto
starttheengine,graduallymovethechokeleverback
towardtheOpenpositionastheenginewarmsup.
Iftheenginestallsorhesitates,movethechokelever
backtowardtheClosedpositionuntiltheengineruns
smooth.Allowtheenginetowarmup,thenmovethe
chokelevertotheOpenposition;referto(Figure10).
7.Allowtheenginetowarmupfor2to5minutes.
StoppingtheEngine
WARNING
Inanemergencysituation,stoptheengine
immediately.
Important:Duringnormaloperation,iftheengine
hasbeenworkinghardorishot,letitidleforaminute
beforestoppingtheengine.Thishelpstocoolthe
enginebeforestopping.
1.Movethethrottlelevertotheminimumposition
(Figure11).
2.RotatetheengineswitchtotheOffposition(Figure
12).
ScreedingaConcreteSurface
InstallingtheAluminumScreedBoard
Note:Onlyuseequilateraltrianglealuminumscreedboards
designedforthismachine.
Screedboardwidths:
VS-70VS-80
1.2meters(4feet)
xx
1.8meters(6feet)
xx
2.4meters(8feet)
xx
3.0meters(10feet)
xx
3.7meters(12feet)
x
4.3meters(14feet)
x
4.9meters(16feet)
x
1.Installtheboardclamptotheframeofthemachine
usingsquareboltsandsplit-lockwashers(
Figure21).
1
2
3
4
5
6
7
g021484
Figure21
1.Nut
5.Split-lockwasher
2.Split-lockwasher
6.Aluminumboard
3.Squarebolt
7.Boardclamp
4.Hexbolt
2.Installthealuminumboardtotheboardclampusing
hexboltsandsplit-lockwashers(Figure21).
14