Service Manual
4-30
Z Master 7500-D Series Service Manual
March 2018 - Digital Edition
Table of Contents
ENGINE
Yanmar Engine Replacement (Cont.)
Installation (Cont.)
38. Install the two carriage bolts and two screws securing the skid plate to the machine (Figure 43).
Tech Tip: Insert the carriage bolts towards the front of the machine first, pivot the skid plate into position, then
install the rear bolts.
39. Install the air shield and cross channel into position on the machine. Secure with six (three per side) bolts.
40. Route the tank vent lines through the 3 clamps and install to the opposite ROPS tube.
41. Connect the global power port and alarm.
42. Install the two clip retainers to the cross channel.
43. Install the heat deflector panel loosely secure with three fasteners.
44. Route wiring harness through heat deflector panel and loosely secure with zip ties.
45. Verify wire harness and fuel line routing to prevent interference.
46. Tighten the heat deflector panel fasteners and zip ties.
47. Install the front seat mount, see “Front Seat Mount Installation,” chapter 5, page 5-27.
48. Install the seat, see “Seat Installation,” chapter 5, page 5-24.
49. Tighten the drive wheel release valve, located on the LH and RH side of the transmission.
Figure 43










