Service Manual

30
310-3000 IHT
ASSEMBLY AFTER A
COMPLETE TEAR-DOWN
If the unit has been torn down completely, the fol-
lowing summary identifies the assembly proce-
dures necessary to completely assemble the unit,
in the order they must be completed. Each as-
sembly procedure is located by a page refer-
ence.
The part reference numbers provided in each
assembly procedure are keyed to the individual
exploded views, and are also keyed to the com-
plete unit exploded view, Figure 19.
1. Assemble the Directional Control Assembly
(Page 29).
2. Assemble the Motor/Center Section/Pump
Assembly (Page 26,27,28).
3. Assemble the Planetary Differential Assem-
bly (Page 24,25).
4. Assemble the Lower Housing/Filter/Manifold
Assembly (Page 23).
5. Assemble the Charge Pump Assembly
(Page 22).
6. Assemble the Input Shaft Assembly (Page
21).
7. Assemble the Fan and Pulley Assembly
(Page 20).
8. Assemble the Torque Bracket Assembly
(Page 19).
9. Assemble the Control Arm Assembly (Page
17,18).
10.Assemble the Bypass Assembly (Page 16).
11. Assemble the Brake Assembly (Page 14,15).
TRANSAXLE
INSTALLATION
Use the following procedure to complete instal-
lation of the transaxle on the vehicle.
1. Install and secure the transaxle on the vehicle
according to instructions in the vehicle
owners manual.
2. Install the hub assembly (118, Figure 13) on
the shaft. Install hex nut (119, Figure 13).
3. With the vehicle raised, install the wheel on
the hub, and retain with the wheel lug nuts.
4. Lower the vehicle wheels to the ground, and
torque the nut retaining the hub to 290 to 295
lb.-ft., using an air impact wrench.
5. Tighten the wheel lug nuts.