Service Manual
HYDRAULIC SYSTEM
5-16     Toro Z Master G3 3000/5000/6000 Series Service Manual
5
39.  Using a 1/2” drive breaker bar installed in the square 
hole in the pump idler assembly, rotate the idler arm 
counter-clockwise, tensioning the spring to allow 
room to install the belt (Fig. 319).
  Fig. 317  PICT-8687a
37.  If necessary, tighten the castle nut until the next set 
of slots line up with the cross hole in the shaft. Do 
not loosen the nut to align the slot.
38.  Install the cotter pin. Use a new cotter pin if needed 
(Fig. 318).
  Fig. 318  PICT-8689
  Fig. 319  PICT-8557a
40.  While holding spring tension, install the v-belt 
around the UHT pulleys and the engine drive pulley. 
Release tension when belt is in place (Fig. 320).
  Fig. 320  PICT-8561a
35.  If more than two threads (0.1”/25mm) are showing, 
remove the nut and install a washer between the 
hub and the castle nut.
36.  If a washer was added, re-torque the slotted nut to 
200 ft-lbs. (271 Nm) (Fig. 317).










