Operator's Manual

Figure 19
1. Indentations for drilling
holes
4. Use the existing holes to
create a line
2. Upper tube 5. Line to cut tube
3. Cut off 3–1/2 inches (89
mm) for 60 inch mowers
with gas engines only
Step
8
Installing the Discharge
Tubes
Parts needed for this step:
1
Upper tube
1
Lower tube
3
Bolt, (#10 x 3/4 inches)
3
Locknut, (#10)
3
Washer, (7/32 inch)
Procedure
Important: Mak e sur e the mo w er deck
is in the lo w est height-of-cut position while
installing the discharge tubes.
Note: R emember to re place the g rass deflector
when the bag g er is remo v ed from the mo w er .
R efer to R e placing the Grass Deflector .
1. Diseng ag e the PTO and set the parking brak e .
2. Stop the engine , remo v e the k ey , and w ait for
all mo ving par ts to stop before lea ving the
operating position.
3. Lo w er the mo w er dec k to the lo w est
height-of-cut position.
4. R emo v e the bags for viewing the tube under
the hood.
5. Install the upper tube into the bag g er opening
and pull it bac k out so the r ubber seal is
protr uding out ( Figure 20 ).
Figure 20
1. Upper tube 3. Bagger hood
2. Bagger opening
6. With the hood in the do wn position, measure
the distance the tube is inside the hood.
Measure from the hood plate to the edg e of
the tube as sho wn in Figure 21 . T his distance
needs to be 3/4 inc h (19 mm).
14