Operator's Manual

Maintenance
Recommended Maintenance Schedule(s)
Maintenance Service
Interval
Maintenance Procedure
After the rst 8 operating
hours
Inspect the bagger belt.
Inspect the bagger.
Before each use or daily
Clean the hood screen.
Clean the bagger.
Every 25 hours
Inspect the bagger belt.
Every 50 hours
Grease the idler arm.
Every 100 hours
Inspect the bagger.
Cleaning the Hood Screen
T he screens need to be cleaned before eac h use . In
w et g rass they will need to be cleaned more often.
1. Diseng ag e the po w er tak e off (PTO) and set
the parking brak e .
2. T ur n off the engine , remo v e the k ey , and w ait
for all mo ving par ts to stop before lea ving the
operating position.
3. Open the bag g er hood.
4. Clean the debris from the screen.
5. Close the bag g er hood.
Cleaning the Bagger and
Bags
T he bag g er needs to be cleaned daily .
1. W ash the inside and outside of the bag g er
hood, bags , tube , and the underside of the
mo w er . Use a mild automoti v e deterg ent to
remo v e dir t.
2. Mak e sure y ou remo v e matted g rass from all
par ts .
3. After w ashing all par ts , let them dr y thoroughly .
Note: With all par ts installed, star t and r un the
mac hine for a min ute to assist in dr ying .
Inspecting the Bagger Belt
T he bag g er belt tension needs to be c hec k ed after
the first 8 hours and ev er y 25 hours there after .
Chec k belts for crac ks , fra yed edg es , bur n marks
or any other damag e . R e place damag ed belts .
Replacing the Bagger Belt
1. Diseng ag e the PTO , mo v e the motion control
lev ers to the neutral loc k ed position, and set
the parking brak e .
2. Stop the engine , remo v e the k ey , and w ait for
all mo ving par ts to stop before lea ving the
operating position.
3. Pull bac k on the spring loaded idler pulley to
reliev e the belt tension ( Figure 34 ).
4. R emo v e the existing bag g er belt from the
mo w er dec k pulley and then the blo w er pulleys .
5. Install the new belt around the blo w er pulleys
and the mo w er dec k pulley ( Figure 34 ).
25