Operator's Manual

g003388
Figure23
1.Hoodplate
4.19mm(3/4inch)
2.Uppertube
5.Edgeoftube
3.Hoodinthedownposition
7.Oncethe19mm(3/4inch)measurementhas
beenachieved,marktheuppertubeonthe
outsidewheretherubbersealprotrudesout
(Figure24).
Note:Thisismarkedtoensurethecorrect
positionfortheuppertubewhendrillingthe
holesandconnectingtheupperandlowertubes.
Note:Therubbersealmustprotrudeoutfrom
thebaggerhood.
g003393
Figure24
1.Uppertube3.Baggerhood
2.Rubbersealprotrudingout4.Markhereagainstthe
rubberseal
8.Installthelowertubeintotheuppertube(Figure
25).
g003424
Figure25
1.Lowertube2.Uppertube
9.Slidethelowertubeontothebootandlatch
themtogether(Figure26orFigure27).
Note:Thereisalatchonthetopandbottom
oftheblowerhousing.
14