Operator's Manual

g018440
Figure29
1.Uppertube3.Baggerhood
2.Rubbersealprotrudingout
12.Aligntheuppertubeholestomatchthedimples
onthesurfaceofthelowertube.
Note:Ensurethatthesideproleappearsas
showninFigure30.
Note:Donotusetheopenholenearthe
moldedarrowheads.
g020776
Figure30
1.Uppertube
3.Notchatthebottomofthe
tubewheninstalled
2.Existinghole(bolt
removed)
4.Lowertube
13.Usingtheexistingholesintheuppertubeas
atemplate,drill2holes,6.5mm(1/4inch)
diameter,throughthedimplesonthelowertube
(Figure31).
g018439
Figure31
DrillingLowerDischargeTube
1.Dimples4.Uppertube
2.Lowertube
5.Installscrew(1/4x3/4
inch),washer(1/4inch),
andlocknut(1/4inch)
here.
3.Drill6.5mm(1/4inch)
diameterhole
6.Uppertube—existing
holes
14.Removetheupperandlowertubesfromthe
machine.
15.Slidethetubestogetherandaligntheholes.
16.Installthewashers(1/4inch)ontothebolts
(Figure31).
17.Usingahexkeytool,installthescrews(1/4x
3/4inch)andwashers(1/4inch)fromtheinside
ofthelowertubeandthroughtheexistingholes
intheuppertube(Figure31).
18