Operator's Manual

Determinetheleftandrightsidesofthemachinefromthenormaloperatingposition.
1
PreparingtheMachine
NoPartsRequired
Procedure
Performthefollowingproceduretopreparethe
machineforattachingtheblowerandnishingkit.
1.Parkthemachineonalevelsurface.
2.Disengagetheblade-controlswitch,engage
theparkingbrake,andmovethemotion-control
leversoutwardtotheNEUTRAL-LOCKposition.
3.Shutofftheengineandremovethekey.
4.Ensurethatthemachineissecurefrom
movementbeforeyoubegintoworkonit.
5.Repairallbentordamagedareasofmachine
deckandreplaceanymissingparts.
6.Cleanthemachineofanydebrisonthemachine
deckorrearpartofthemachinetoease
installation.
2
InstallingtheWeight
Partsneededforthisprocedure:
1Weighttray
1
Leftweight-traymount
1Rightweight-traymount
1
Suitcaseweight—16kg(35lb)
1Retainingrod
2
Bolt(3/8x1-1/4inches)
4
Flangenut(3/8inch)
2
Carriagebolt(3/8x1inch)
2
Self-tappingbolt(5/16x3/4inch)
Procedure
CAUTION
Thebaggerchangestheweightdistributionof
themachine.Operatingthemachinewithout
thefrontweightsmaycauseanunstable
condition,whichcouldresultinalossof
control.
Ensurethefrontweightsareproperlyinstalled
beforeoperatingthemachinewiththebagger
attachment.
1.Removetheexistingboltandnutfromtheleft
andrightsideoftheplatformwhereyouwill
installtheweight-traymounts.
2.Usethe2self-tappingbolts(5/16x3/4inch),2
bolts(3/8x1-1/4inches),andangenuts(3/8
inch)tosecuretheleftandrightweight-tray
mountstothemachine(Figure3).
6