Use and Care Manual

Determinetheleftandrightsidesofthemachinefromthenormaloperatingposition.
1
PreparingtheMachine
NoPartsRequired
Procedure
Performthefollowingproceduretopreparethemachinefor
attachingtheblowerandnishingkit.
1.Parkthemachineonalevelsurface.
2.Disengagetheblade-controlswitch,engagetheparking
brake,andmovethemotion-controlleversoutwardto
theNEUTRAL-LOCKposition.
3.Shutofftheengineandremovethekey.
4.Ensurethatthemachineissecurefrommovement
beforeyoubegintoworkonit.
5.Repairallbentordamagedareasofmachinedeckand
replaceanymissingparts.
6.Cleanthemachineofanydebrisonthemachinedeck
orrearpartofthemachinetoeaseinstallation.
2
InstallingtheWeight
Partsneededforthisprocedure:
1Weighttray
1
Leftweight-traymount
1Rightweight-traymount
1
Suitcaseweight—16kg(35lb)
1Retainingrod
2
Bolt(3/8x1-1/4inches)
4
Flangenut(3/8inch)
2
Carriagebolt(3/8x1inch)
2
Self-tappingbolt(5/16x3/4inch)
Procedure
CAUTION
Thebaggerchangestheweightdistributionofthe
machine.Operatingthemachinewithoutthefront
weightsmaycauseanunstablecondition,which
couldresultinalossofcontrol.
Ensurethefrontweightsareproperlyinstalled
beforeoperatingthemachinewiththebagger
attachment.
1.Removetheexistingboltandnutfromtheleftand
rightsideoftheplatformwhereyouwillinstallthe
weight-traymounts.
2.Usethe2self-tappingbolts(5/16x3/4inch),2bolts
(3/8x1-1/4inches),andangenuts(3/8inch)to
securetheleftandrightweight-traymountstothe
machine(Figure3).
6