Use and Care Manual

1
InstallingtheWeight
Partsneededforthisprocedure:
4
Bolt(3/8x1-1/4inches)
4
Locknut(3/8inch)
1
Leftweightmountingbracket
1Rightweightmountingbracket
4Washers
1Weightbracket
2
Bolt(3/8x1inch)
1Flatweight
1
Suitcaseweight
1Keyedcrossbar
Procedure
Note:Thisprocedureisonlyformodelswithcontrol
levers.Steeringwheelmodelsdonotneedweights
installed.
CAUTION
Thebaggerchangestheweightdistributionof
themachine.Operatingthemachinewithout
thefrontweightsmaycauseanunstable
conditionwhichcouldresultinalossof
control.
Ensurethefrontweightsareproperlyinstalled
beforeoperatingthemachinewiththebagger
attachment.
1.Ifyouareinstallingthisbaggeronamachine
equippedwithMyRIDE,performthefollowing
steps:
A.Removetheboltandnutfromthefront
shockassembly(Figure3);retainthe
hardware.
Note:Thisallowsyoutoraisethefoot
platformsothatyoumayremovetherail
guards.
g246434
Figure3
1.Nut2.Bolt
B.Removethe2railguardsand6hex-washer
headscrews(1/4x13/16inch)fromthe
platform(Figure4).
Retaintheremovedhardware.
5