Installation and Programming Guide

5
Control Wires Installation
Step 1 – Route the valve control wires between the valves and the MC-E controller.
For wire runs up to 1000’ between the controller and the valves, it is recommended to use an 18 AWG
(1.0 mm
2
) multi-wire sprinkler valve connection cable. This cable is insulated for direct burial and is color
coded to simplify installation.
Step 2 – Attach one wire from each valve solenoid to the
white color-coded wire from the cable. (Since
the valve solenoid has no polarity, either wire
can be used for this connection.) Designate this
connection as the Valve Common.
Step 3 – Attach a separate cable wire to each of the
remaining valve solenoid wire. Take note of the
wire color being used for each valve as well
as the watering zone/area it is designated. This
information will be important when connecting
the valve wires to the controllers station
terminals.
Step 4 – Use wire nut fasteners to secure the valve
solenoid wire connection. Waterproof all
connections with grease caps or similar
insulation method.
Step 5 – Route the other end of the control wires into the
provided conduit hole at the bottom of the cabinet. Leave about 8” of cable remaining in the cabinet. Expose
about 3/8” of bare wire from the station and the valve common wires.
Step 6 – Secure the valve common wire to one of the three terminals labeled “VALVE COMMON” and each valve wire
to its appropriate station terminal designation.
VALVE
COMMON
VALVE
COMMON
VALVE
COMMON
MASTER
VALVE
YEL RED
VALVE
COMMON
GND
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42
Figure 2
Master
Valve
Pump Start
Relay
Station 1 Station 2 Station 3