User's Manual

II. SCHEDULE SETUP
Run Days
Schedule refers to the days of the week you want a program to run. Up to 16 unique
efined in the Sentinel Controller. For identification, each
ent ranging from 1–16. In the Display of the controller,
e ill be indicated by “S” and then the two-digit schedule Number (01, 02,…
the controller reaches the end
watering day schedules can be d
schedule has a number assignm
th schedules w
16). For example, Schedule 12 would be shown as “S12.”
Each schedule is six weeks long with any combination of watering days and may be
assigned to any of the sixteen programs (covered in Program Setup). You must assign a
schedule to a program to activate it. The current Schedule Week was set in Time & Day
s part of controller setup (example was set to W1). When a
of Week 6 (w6) it loops back and starts again with Week 1 (W1).
SCHEDULE DATA Run Days Edit Mode
Use this Submenu Edit Mode to configure the sixteen independent schedules (water
ays): d
The second line of the display indicates as follows:
S01 = Schedule 1
WK 1 = Week 1 of Schedule
U = Sunday
E SELECT key to select the schedule desired
g the Right and Left Arrow keys ( , ) under the
ig rrow keys ( , ) to select the week desired.
,
S
) to save the status of the day. Continue this process to set up the
entire schedule or to view the status of the other days.
S
ON = On (active watering day)
Use the CLUSTER/SCHEDUL
(S01…S16). Position the cursor usin
K d it and use the Up or Down AW
Position the cursor under the day of the week and use the Up or Down Arrow keys (
) to select the weekday (SU, MO, TU, WE, TH, FR, SA) desired.
Position the cursor under the ON (or OFF) indica n d use the OFF/NO or ON/YEtio an
keys ( , ) or the Up or Down Arrow keys ( , ) keys to designate the day as a
watering day (ON) or a non-watering day (OFF).
Press ENTER (
14