After the cabinets have been floor mounted, the AC power components should be installed. Tables
4-7 and 4-8 show the primary AC power components required for floor mounted systems.
Table 4-7 Floor Mount Cabinet Component Requirements for 120VAC Primary Power
Local
Electrical
Code
Cabinets
1 2 3 4 5 6 7
Three or more
cabinets
require a
conduit box
1 – BFIF 1 – BFIF
1 -BCCB120
1
1 – BFIF
1 – BCCB120
1
1 – RPSB2
1 – BFIF
1. A BCCB120 conduit connection box must be installed and wired by a certified electrician per the local
electrical code (see Figure 4-24).
1 – BCCB120
1
2 – RPSB2
1 – BFIF
N/A N/A
Table 4-8 Floor Mount Cabinet Component Requirements for 208VAC or 240VAC Primary Power
Local
Electrical
Code
Cabinets
1 2 3 4 5 6 7
Two or more
cabinets
require a
conduit box
1 – BACL240
1 – BFIF
1 – BCCB240
1
2 – BACL240
1 – BFIF
1. A BCCB240 conduit connection box must be installed and wired by a certified electrician per the local electrical code (see
Figure 4-25).
1 – BCCB240
1
1 – BPSB240
3 – BACL240
1 – BFIF
1 – BCCB240
1
1 – BPSB240
4 – BACL240
1 – BFIF
1 – BCCB240
1
2 – BPSB240
5 – BACL240
1 – BFIF
1 – BCCB240
1
2 – BPSB240
6 – BACL240
1 – BFIF
1 – BCCB240
1
3 – BPSB240
7 – BACL240
1 – BFIF