Maintenance Manual

4.25 Fluorescent lamp 4 Replacement Procedures
PORTEGE A100 Maintenance Manual (960-460) 4-71
3. Disassembly of Source PCB and Gate PCB
<Procedure>
1) Disassembly of Gate PCB
Caution: Pressure or stress should not be given on PCB and TCP during removing
double tape.
2) Disassembly of Source PCB
Caution: Pressure or stress should not be given on PCB and TCP during removing
double tape.
Figure 4-58 Replacing LG Phillip fluorescent lamp (3)