Installation Guide

Page 8 of 16
HD- SYSTEM OPERATING MANUAL Revision: 1/26/2018
INSTALLATION PROCEDURES:
1. For rough-in dimensions, see installation detail below.
2. The bathtub must be set on a solid flat surface capable of supporting the tub using all six (6) adjustable
feet. It is required that all six (6) feet come in contact with the floor.
3. The plumbing connections (faucet, hoses, and waste/overflow) should be made prior to setting the tub in
place.
4. The filler panel is used only for 60” installations.
5. The door drain assembly is attached at one end at the factory. The drain body is to be installed between
the drain shoe and the drain tee.