Installation & Assembly

TM2084R
STEP-BY-STEP ASSEMBLY
3
#0964-3138
©2018 Stevens Industries, Inc.
Due to continuing product development, Stevens reserves the right to change specifications without notice.3594.TM2084.10/18/18
Identify Left End (3), Right End (1) and Top-
Bottoms (2). Note that routed channels along
back edges will all face interior of unit for
installation of Back (4).
STEP
1
With front edge of Left End (3) resting on floor,
insert dowels on one Top-Bottom (2) into holes on
Left End (3), making sure channels are oriented
correctly, as shown. Press firmly into place.
STEP
2
Carefully position assembly with Left End (3) flat
on floor, and dowels on Top-Bottoms (2) and
Fixed Shelf (8) facing up.
STEP
5
Slide Back (4) into channels on Top-Bottoms (2)
and Left End (3). Make sure pre-drilled holes on
Back (4) align with back edge of Fixed Shelf (8).
If they do not align, remove Back (4), rotate 180°,
reinsert and check alignment. Seat firmly into
place.
STEP
6
channel
front edge
channel
Secure Left End (3) to Top-Bottom (2) with two
Confirmat Bolts (21), using the included Hex
Wrench.
STEP
3
Repeat Steps 2 & 3 with other Top-Bottom (2)
and Fixed Shelf (8). Be sure to correctly identify
these parts. Top-Bottom (2) has a routed channel;
Fixed Shelf (8) does not.
STEP
4
channel
channels
pre-drilled
holes
Insert dowels on TK-Stringers (7) into upper and
lower holes on Left End (3). Top Stringer (7) will
be at upper back of unit; bottom Stringer (7) will
be at lower front of unit (for toe kick). Press firmly
into place.
STEP
7
Bottom
Stringer
To p
Stringer