ABR626ST Instruction Manual

Finish decking and seal bathtub
ABR & ABY Installation (continued)
Connect the drain to plumbing
 Follow local codes
 Make sure that connections are tight to avoid leaks.
5
Make electrical connections (AirBath)
 All electrical connections must be made by a licensed electrician and
meet local codes. Refrain from using extension cords.
 Class A, 15 amp Ground Fault Control Interrupter (GFCI) with grounding
is required.
 The controller, blower and GFCI must be accessible.
6
7
With Flange
Silicone
With Tile-in Flange
 Pre-drill pilot holes through the tile-in flange.
 Mount with screw or nail to studs.
 Finish tiling the bathtub deck and be sure to seal the
bathtub lip to prevent leaks.
Silicone
Finished Surface
Optional Under Mount
 See spec sheet to determine if this is available
 Cut finished surface to desired dimensions.
 Dry fit to the bathtub.
 Temporarily mark on the bathtub the edge of the opening of the finished surface.
 Remove the finished surface and apply silicone to the bathtub (underneath the
finished surface location).
 Replace the finished surface and secure it.
 Add and/or remove silicone as desired.
 Make sure the finished surface is not supported by the bathtub and is secured per
local codes.