ABR626ST Instruction Manual

ABF Installation with access under the floor (continued)
Install Drain Hardware
 Apply a bead of clear silicone or plumbers putty around the drain body and pass it through the drain hole.
 Apply Teflon tape to the threaded portion of the drain body.
 Apply plumbers putty to the washer and slide it over the bottom of the drain body.
 Attach the drain body nut on the drain body and tighten until the nut and washer have created a seal with the
bottom of the bathtub. Do not over tighten.
2
Install Overflow Hardware
 Place the back plate over the screw of the overflow cover.
 Align the overflow cover with the bar (installed at the factory) in the overflow hole.
 Carefully hand tighten the overflow cover until it stops. Do not over tighten.
3
Install Bathtub
 Apply a generous bead of adhesive
or silicone (such as GE 5040 Sili-
cone II) to the bottom of the tub sup-
ports.
 Apply a bead of tub and tile caulk
(such as GE 7000 Silicone II Pain-
table Silicone) around the edge of
the base.
 Carefully set the tub into position
and finish the installation of the tail-
piece (supplied by the installer).
 Be sure the tub is resting on the bot-
tom supports and not the acrylic.
4
Complete Installation
 Fill the tub with water to the over-
flow and drain the tub while in-
specting the waste connections
below the floor for leaks. Access
from below will be necessary for
this step.
 With the bathtub now in place
wipe off any excess tub and tile
caulk around the bottom edge of
the bathtub where it meets the
floor.
 Run a bead of tub and tile caulk
around the bottom edge of the bathtub where it meets the
floor. Wipe off any excess caulk with a wet cloth.
5