Installation Guide

6
ENGLISH
10. Pick up the tank and carefully guide
the water supply hose over the
bowl’s fill valve hole, align the tank-
to-bowl gasket over the inlet of the
bowl, and align the tank bolts over
the bolt holes of the bowl.
11. Using provided tank-tight nuts,
hand tighten the nuts evenly until
tank sets snugly on each of the 3
contact points on the bowl (ill. 8).
Do not overtighten
the mounting bolts.
Overtightening may
break the china and cause
personal injury and/or
property damage.
12. Install the flexible water supply
hose to the angle stop (ill. 9). Make
sure that the hose is free of kinks.
CAUTION
INSTALLATION PROCEDURE
Tank-tight nut
50mmradiusminimumMakesuretherearenokinks
ill. 9
Tank to Bowl
Gasket
Fill valve nut
Flush valve nut
ill. 7
1
3
2
Points of Contac t
ill. 8