Installation

3
ENGLISH
BEFORE INSTALLATION
In order for your new TOTO toilet to t correctly, check the dimensions below:
Supply Valve
Wall
12"
C/L
Closet
Flange
C/L
6" *
* Recommended
minimum
requirement.
INSTALLATION PROCEDURE
1) Clean any debris out of the closet ange,
then install the mounting bolts into the
slots of the ange (see Illustration 1). The
bolt should be inserted into the slot with
its head down and threaded shank pointed
upward.
2) Carefully turn the toilet upside down on
some padding. Firmly press a new wax
seal (not supplied) onto the circular recess
around the outlet opening (see Ill. 2). Turn
the toilet upright and gently lower it into
position over closet ange & bolts. With the
toilet properly aligned, press down rmly
on both sides of toilet rim to seat wax seal.
C AUTION: Do not move toilet after the
wax seal is set.
3) Insert the cap base, washer and thread nuts
onto the bolts and hand tighten. Then
tighten the bolts an additional ½ turn.
Install the bolt caps.
N OTE: If the cap does not t properly,
check that cap base has the correct side
up indicated by THIS END UP (THIS PART
UP). Or check for interference of the
mounting bolt with the cap. Carefully cut
the bolt length to allow the cap to t.
W ARNING! Do not over-tighten the nuts.
Damage to china or plastic parts may
result.
Ill. 1
Ill. 2