Installation Guide

Installing the top unit and trail operation
Refer to the installation instructions included in packaging for the top unit.
Side panels
Installing the side panels
Installing the water supply hose
Put the gasket* in the closed end of
the nut and secure to the water
shutoff valve.
*The gasket is included in the box
with the water shutoff valve.
Water shutoff valve
Gasket
Water supply hose
Velcro tapes
Reference lines
For Better Results
The manufacturer recommends that silicone caulking be placed around the bottom of the toilet bowl base to prevent water and urine from
collecting underneath the floor materials, resulting in a stained floor.
Silicon caulking
Interior wall of the toilet bowl
Exterior wall of the toilet bowl
6
8
7
Side panels
After a trial operation of the NEOREST 550, place the side panels
along red lines (see reference lines). Push firmly on the position of
Velcro tapes.