0GU4275 WIDE SPREAD LAVATORY FAUCET IM OM

7
ENGLISH
INSTALLATION PROCEDURE
Drain
Lift Rod
Screw
Pivot
Arm
Drain Lift Rod
Connecting Part
11. Prepare the pivot arm by
placing one bushing on each side
of the pivot ball as shown. Insert
the short end of the rod into
the drain body and through the
eyelet hole in the plunger.
Fasten the pivot ball nut to
secure.
Insert the drain lift rod and
pivot arm into the drain lift rod
connecting part.
Tighten both rods with
screwdriver.