Installation Instructions
TowerIQ, Inc | 1609 Park 370 Place, Hazelwood, MO 63042| 844‐626‐7638 | cs‐guardian@tower‐iq.com
23
Note that red flashing lights indicate the system has detected oscillation for the corresponding channel(s). The band will turn off if
adjustments are not made. When adjusting booster attenuation, full power is not always the best option. The goal is to obtain a signal
level throughout the building that meets safety requirements.
The following diagrams and notes explain how to interpret, and use, these switch banks.
DIP switch organization
PS 700 DL DIP switches control
700 band downlink
PS UL DIP switches control 700 band and 800
band uplinks
PS 800 DL DIPswitches control 800 band
downlink
ATTENUATION THROUGH SENTRY SOFTWARE IS CUMULATIVEWITH
THAT OF THE BOOSTER’S DIP SWITCHES.