Product Manual
FIGURE 1
MINIMUM 12" FROM
WALL-LEFT SIDE
CONTROL PANEL
ACCESS
MINIMUM 1" FROM
WALL-RIGHT SIDE
FOR COVER
REMOVAL
FRONT VIEW
AIR FLOW
LEFT SIDE
VIEW
ACCESS DOOR FOR
OPERATIONAL
ADJUSTMENTS
STEP 1: CONCEALED DAMAGE:
THE EQUIPMENT IS IN GOOD CONDITION WHEN IT LEAVES THE FACTORY. BE SURE TO INSPECT THE CARTONS CAREFULLY
FOR CONCEALED DAMAGE AND REPORT IT TO THE CARRIER IMMEDIATELY.
STEP 2: SELECT LOCATION: SEE FIGURE 1 FOR CLEARANCES:
SELECT MOUNTING LOCATION WHICH ALLOWS THE FOLLOWING MINIMUM CLEARANCES FROM WALLS OR OBSTRUCTIONS:
1. 12 INCHES FROM LEFT END OF HEATER TO ALLOW EASY ACCESS FOR INSTALLING AND OPERATIONAL ADJUSTMENTS.
2. 1 INCH FROM RIGHT END TO PROVIDE ACCESS FOR COVER REMOVAL.
3. 4 INCHES FROM FINISHED FLOOR TO BOTTOM OF FRONT COVER.
STEP 4: HEATER MOUNTING:
MOUNT BACK PANEL OF HEATER TO SELECTED VERTICAL WALL USING MOUNTING SLOTS. MAKE SURE THAT ALLOWANCE
FROM ADJACENT WALLS IS FOLLOWED AS STATED ABOVE. SEE TABLE 1 FOR DIM. "D" AND "L". SEE FIGURE 2 FOR MOUNTING
SLOT LOCATIONS.
STEP 5: ELECTRICAL CONNECTION:
VERIFY THAT SUPPLY VOLTAGE AND HEATER NAMEPLATE VOLTAGE ARE THE SAME. USING TWIST CONNECTORS, CONNECT L1
AND L2 TO LINE SUPPLY. CONNECT GROUND WIRE TO CABINET GROUND SCREW. ELEMENT FINS CAN CAUSE CUTS, DO NOT
TOUCH.
STEP 6: REINSTALL FRONT COVER:
REPLACE FRONT COVER BEING CAREFUL NOT TO DAMAGE ELEMENTS. STRAIGHTEN ELEMENT FINS AS NEEDED. REPLACE
SCREWS IN FRONT COVER TO COMPLETE INSTALLATION.
9878
STEP 3: (DISCONNECT POWER BEFORE SERVICING) REMOVE FRONT COVER:
REMOVE FRONT COVER BY LOCATING AND REMOVING SCREWS IN COVER. PUNCH OUT SELECTED KNOCKOUT IN LOWER LEFT
OF BACK PANEL. USING APPROVED CONNECTORS AND WIRING METHODS, RUN SUPPLY WIRES TO JUNCTION BOX AREA. SEE
FIGURE 2 FOR KNOCKOUT LOCATIONS.
MINIMUM 4" ABOVE
FINISHED FLOOR
AIR FLOW
FIGURE 1
MINIMUM 4" ABOVE
FINISHED FLOOR
5.0
ACCESS DOOR FOR
OPERATIONAL
ADJUSTMENTS
3.0
16.0
1.5 1.5
.875 DIA. KO
2 EA
"D"
6.0
MOUNTING SLOTS
MOUNTING SLOTS
1.88
12.63
DIM "L"
FRONT VIEW
LEFT SIDE
VIEW
FIGURE 2: